Due to the rapid grow of the IT needs of our customers we needed to expand our power connection. For this expansion a new heavy power cable was needed. This cable runs directly from our building to the transformer-building.
With the new power cable in place we are able to provide 3 times more power then before. Enough to power our complete datacenter at 100% load.